资讯

SpaceX’s next mission as part of its Transporter small payload rideshare program, Transporter 14, launched from Space Launch ...
With summer and winter for the Northern and Southern Hemispheres now in full swing, the halfway point of 2025 is fast ...
On June 6, the Department of the Air Force released the Draft Environmental Impact Statement for Starship-Super Heavy ...
By the evening of the anomaly, Ship 36 had already completed two cryogenic proof tests and a single-engine static fire. The ...
One such discovery made regarding the Sun’s magnetic field is that, at the solar south pole, the Sun’s magnetic field is ...
Relativity Space has been working diligently to prepare the Terran R Rocket and its supporting infrastructure for its first ...
4.2K. The Artemis II mission, humanity’s first crewed mission to the vicinity of the Moon since 1972, will wait longer to get off the ground. Originally planned for September 2025, Artemis II ...
3.6K. As NASA pushes out the schedule for Artemis II and III, development of the first major upgrade to the agency’s Space Launch System (SLS) rocket is moving into qualification.
137. As space-based research and manufacturing ramp up, a market is emerging for returning payloads to Earth affordably and reliably. European startup ATMOS Space Cargo is meeting that need with a ...
On the first stage, the CZ-3B uses a YF-21C engine with a 2,961.6 kN thrust and a specific impulse of 2,556.5 Ns/kg. The first stage diameter is 3.35 m and the stage length is 23.272 m.